how we are doing elementary school interior design these days. "A space that becomes a learning material" Chuncheon Shindong Elementary School #1

 

Staff and user briefing sessions

Public project, starting from the question of what kind of space would be good for our students.
Interior design project. "Sindong Elementary School interior space planning and design"



[ Start of the project ]


Starting in early 2024, until around Chuseok 2024,


The project "Chuncheon Shindong Elementary School Relocation Construction" that was carried out from planning to construction 


The elementary school was founded in 1939 and opened on September 1, 24 as a school that was relocated to a new building.


It consists of about 500 students, 41 classes, and about 40 faculty members.


기존 신동초등학교 외관


The design work was carried out starting in 2021 through a design competition, the construction company was selected in September 2022, and construction is scheduled to be completed in September 2024.


Chuncheon Sindong Elementary School New Construction Design Service Winning Proposal
(Design by Dain Architecture)


In response to the client's request for an interior space design proposal, we attempted to come up with a new proposal for the interior space based on the characteristics of the space that the building possesses.


[Direction of design proposal]

I took the phrase “a space that becomes a learning material” and thought hard about how to solve it from various perspectives.


Based on the characteristics of existing architectural spaces, we attempted to understand the purpose of use and the situation of users of the separated spaces and to create interior spaces using spatial characteristics, material properties, various objects, and rawness.


교직원 설명회 및 질의응답 현장사진.


It seems that it is not easy to continue the design while accepting the purpose and various functions of the space desired by the school, considering the space from the students' perspective, continuously trying various productions and thinking about the space from the designer's perspective, and considering construction costs and construction schedules from the business owner's perspective.


The proposed interior space is as follows.

1층 내부공간 제안 범위



2층 내부공간 제안 범위


3층 내부공간 제안 범위


3층 전이공간 제안 범위


4층 내부공간 제안범위


5층 내부공간 제안 범위



As a result, before construction began, we met with various people in charge and users from various fields who had various concerns, discussed and consulted,


established the scope and direction, and continued to make design proposals accordingly.


Continued from #2 for design proposals....





Contact us : PH partners Group

02-875-1077 / jk21507@phpartners.kr

www.phpartners.kr


PH partners

PH partners Group (부동산 컨설팅 , 공간 설계 및 시공)전문건설면허업체

phpartners.kr


댓글

이 블로그의 인기 게시물

"Change in exterior finish" and "Polycarbonate" improvement work during building remodeling

These days, elementary school interior designs are being developed like this: 'A space that becomes a learning resource.' Chuncheon Sindong Elementary School #2.