These days, elementary school interior designs are being developed like this: 'A space that becomes a learning resource.' Chuncheon Sindong Elementary School #2.

이미지
Part 1: Establishing the project's inception and direction In Part 2, we will share the design process and its outcomes. [Key Issues by Floor] Since the plan was selected through a design competition, the interior space incorporates a variety of innovative changes. An open library spans the areas connecting the 1st to 3rd floors, with other functional spaces diversely arranged throughout. The interior design of Sindong Elementary School transcends traditional learning-focused spaces. It aims to provide a multi-dimensional environment that stimulates students' senses and fosters creative thinking. The design encourages natural exploration and interaction, turning not just classrooms but the entire school into a dynamic learning ecosystem that supports enriched educational experiences. Keywords by Floor and Spatial Issues Considering the spatial characteristics unique to each floor, we extracted relevant keywords and explored various design approaches aligned with those concepts....

how we are doing elementary school interior design these days. "A space that becomes a learning material" Chuncheon Shindong Elementary School #1

이미지
  Staff and user briefing sessions Public project, starting from the question of what kind of space would be good for our students. Interior design project. "Sindong Elementary School interior space planning and design" [ Start of the project ] Starting in early 2024, until around Chuseok 2024, The project "Chuncheon Shindong Elementary School Relocation Construction" that was carried out from planning to construction  The elementary school was founded in 1939 and opened on September 1, 24 as a school that was relocated to a new building. It consists of about 500 students, 41 classes, and about 40 faculty members. 기존 신동초등학교 외관 The design work was carried out starting in 2021 through a design competition, the construction company was selected in September 2022, and construction is scheduled to be completed in September 2024. Chuncheon Sindong Elementary School New Construction Design Service Winning Proposal (Design by Dain Architecture) In response to the client...

"Change in exterior finish" and "Polycarbonate" improvement work during building remodeling

이미지
Remodeling Results  The methods and scope of remodeling a building are very diverse. It can range from very small to very large, enough to be called a business. The project I will introduce today is a commercial-residential building used as a pharmaceutical company's office building in Gangdong-gu, and it was remodeled using a material called "polycarbonate" that strongly conveys a modern exterior feel.   [Current status of remodeled buildings]   The existing building is approximately 20 years old, having received its first use permit in 2004, and although the change in the area of ​​the facade is within the scope of major repairs, it is not subject to permit or reporting requirements according to relevant laws. The construction status was notified to the relevant district office through telephone consultation, and construction began. **If you have any questions about relevant laws and construction progress, please leave a comment at any time and I will respond :) It has ...